San Francisco Public Works has contracted with Precision Engineering, Inc. to install new sewer utilities and renovate the roadway at various locations in District 7 as part of the Various Locations Sewer Replacement and Pavement Renovation No. 40 Project. The old pipes have been videoed internally and are cracked and/or broken. Replacing these pipes now will prevent possible collapse of the sewer mains and pavement in the future. Sewer service will not be interrupted during the construction. Pavement Renovation and Sewer replacement work will occur between April 2020 and November 2021*.
Work Locations | |
Judson Ave | Frida Kaho Way to Edna St |
Congo St | Circular Ave to Montgomery Bl |
Detroit St | Staples Ave to Hearst Ave |
Detroit St | Joost Ave to Stillings Ave |
Malta Dr | Valletta Ct to O'Shaughnessy Bl |
Los Palmos Dr | Teresita Blvd to Foerster St |
Los Palmos Dr | Bella Vista Way to Burlwood Dr |
Hazelwood Ave | Yerba Buena Ave to Globe Alley |
Cresta Vista Dr | Casitas Ave to Conventry Ct |
Lansdale Ave | Robinhood to Dalewood Way |
Broadway St | Octavia St to Gough St |
Broadway St | Franklin St to Polk St |
Broadway St | Powell St to Turk Murphy Ln |
Broadway St | Stockton St to Columbus St |
Coleridge St | Eugenia Ave to Kingston St |
Java St | Masonic Ave to Buena Vista West |
Work will consist of: sewer main replacement, ADA curb ramp construction, street base repairs and pavement renovation, including roadway grinding and paving. traffic control and all associated work. Sewer work will involve some street excavation to install new utilities and will be followed by pavement renovation (i.e. grinding and paving) activity once all utility work is complete. No interruption of sewer service is expected during construction. There may be a delay between utility work and final roadway renovation activity.
The typical sequence of sewer work is to install the new sewer main along the block(s) followed by sewer lateral replacement. Once the sewer main has been installed, Public Works’ engineering team will review video of the sewer laterals to determine which, if any, need to be replaced. The sewer laterals are the connection between the main and the sidewalk/curb. Crews will then schedule the sewer lateral replacement work. Sewer laterals are replaced on an as-needed basis depending on the condition of the line. Sewer service will not be interrupted during construction. Please continue to use your household plumbing as usual.
During construction, traffic control will be implemented and "No Parking/Tow Away Zone" signs will be posted in active work areas. Local access for Residents, Deliveries and Emergency Services will be provided at all times during work hours. Please limit your use of the roadways within the construction work areas during working hours for the safety of the public and our employees, and to park in driveways or on adjacent blocks when No Parking Zones are posted. Should you need access to your property during work hours, please alert a crew member on site and note that there may be a slight delay to enter or exit your property to allow for crews to create a safe path of travel. Please follow instructions from crew members and follow all posted detour signs.
*Please note: Construction scheduling and dates are subject to change due to rain, equipment breakdown, unforeseen field conditions, existing utility conflicts, crew availability, or early/delayed completion of work at a prior location.