The Great Highway was repaved from Point Lobos to Sloat Boulevard. This was a six month project. Streetscape improvements were made to the stretch of road along the Golden Gate Park at Ocean Beach between Fulton and Lincoln. The improvements included new curb ramps, pedestrian crossing and bicycle safety upgrades, and the installation of a landscaped roadway median. Water main installation work is also being performed as a part of the project.
Work includes roadway resurfacing, roadway base repair, concrete sidewalk and curb repairs, adjustment of utility castings to the new roadway surface, ADA curb ramp construction at pedestrian crossing points, and sewer and drainage work.
Public Works managed the construction of the street and streetscape improvements.