  • Anza Street and Park Presidio Boulevard

Various Locations Pavement Renovation and Sewer Replacement No. 35

Project Description

San Francisco Public Works and the San Francisco Public Utilities Commission have partnered to complete infrastructure improvements on several neighborhood blocks.  Our partnership allows us to minimize impacts to the public by consolidating work whenever possible.

This project will include sewer main replacement, curb ramp installation, street base repairs and repaving.  Work hours will vary by location, however, typical working hours are 7 a.m. to 5 p.m. Monday through Friday.  Weekend work is allowed but has not been scheduled at this time.

The blocks included in this contract are as follows:

  • 18th Street from San Bruno Ave to Vermont Street 
  • Anza Street from Park Presidio Blvd to 30th Ave 
  • Central Avenue from Turk Street to Fell Street 
  • Central Avenue from Oak Street to Waller Street 
  • Charter Oak Ave from Industrial Street to End
  • Crestmont Dr from Christopher Dr to END 
  • Gladeview Way from Panorama Drive to Skyview Drive 
    Glenbrook Ave from Palo Alto Ave to Mountain Spring Ave  
  • Knollview Way from Panorama Drive to Cityview Way
  • Roosevelt Way from Loma Vista Drive to 14th Street
  • Skyview Way from Marview Way to Cityview Wy
  • Sunnydale Ave from Hahn St to End 

 

The typical sequence of sewer work is to install the main along the block(s) followed by sewer lateral replacement. Once the sewer main has been installed, Public Works’ engineering team will review video of the sewer laterals to determine which, if any, need to be replaced. The sewer laterals are the connection between the main and the sidewalk. Crews will then schedule any lateral replacement work.

Please note: sewer laterals will be replaced on an as-needed basis between the main and sidewalk. Sewer service will not be interrupted during construction. Please continue to use your household and business plumbing as usual.

During sewer replacement, driveway access may be impacted while crews work on your block. Please allow extra travel time should crews need to plate over the trench and create a path for your vehicle. If crews are working in front of your house, please let them know a few minutes before you need to exit your driveway. They may need to create a path of travel for your vehicle. We appreciate your cooperation and patience during construction.

Once the sewer work has been completed on a block, crews will begin preparations to repave the block or rebuild the concrete roadway. Preparations may include installation of curb ramps, concrete street base repairs, grinding (removal of existing asphalt) and roadway paving.

 
Pavement and Sewer Renovation
STATUS Completed
Project Team

San Francisco Public Works
San Francisco Public Utilities Commission